Cutting Edge Recycle
5182 Chicago Dr. Hudsonville, MI 49426
Phone: (616) 662-9653 | Fax: (616) 669-5442
Deerview Pit
Deerview Apartment address:
1860 RW Berends Dr, SW Wyoming MI 49519
2024 MATERIAL RATE SHEET
Chicago drive location / CDR
Material | Per cubic yard | Per ton |
---|---|---|
Sand | $ 5.75 | $ 4.79 |
Clay Disposal | $ 2.00 |
* Special Pricing Available for large quantities
Please call – 616-293-3726
2024 MATERIAL RATE SHEET
Chicago drive location / CDR
Material | Per cubic yard | Per ton |
---|---|---|
Unscreened topsoil | $ 10.00 | |
Screened topsoil | $ 18.00 | |
Sand | $ 11.00 | |
21AA crushed conc | $ 31.50 | $ 21.00 |
Asphalt Millings | $ 26.25 | $ 17.50 |
Screened Asphalt Millings | $ 31.50 | $ 21.00 |
Crushed Asphalt | $ 31.50 | $ 21.00 |
Peastone | $ 42.75 | $ 28.50 |
Boulders (18″ plus Natural) | $ 157.50 | $ 105.50 |
6″ – 8″ Natural Rocks | $ 142.50 | $ 95.00 |
Limestone Rip Rap “Heavy” | $ 100.50 | $ 67.00 |
Limestone 4″ – 8″ | $ 96.00 | $ 64.00 |
6AA Stone | $ 60.00 | $ 40.00 |
Buying Concrete per load
**Cash or Check**
616-662-9653
616-669-5442
Get Started
Ready to transform your project? Get a free quote today! Contact us for expert excavation, demolition, hauling, and more. Let's build success together!